Photo 3
Contractors replaced the two main electric power feeders that extend the length of the spillway. Workers at the dam reworked the 14 panel boxes, one at each gate, and replaced all components of the control boxes including installing new load circuit breakers, brake transformers control power transformers and all new wiring.

Download Image: Full Size (2.33 MB)
Tags:
Photo by: John Barker |  VIRIN: 170614-A-WQ258-142.JPG