Official websites use .mil
Secure .mil websites use HTTPS
Draft Monitoring and Adaptive Management Plan for the Claiborne and Millers Ferry Locks and Dams Fish Passage Study
Finding of No Significant Impact for Claiborne and Millers Ferry Locks and Dams Fish Passage Study
Draft FR and Integrated EA - Main Report – May 2023
Appendix A – Engineering
Appendix B-1 - Environmental Modeling, Monitoring, and Adaptive Management
Appendix B-2 - Environmental Laws and Coordination
Appendix C - Cost
Appendix D – Real Estate Plan
Appendix E - Socioeconomics
Appendix F – Hydropower Impacts
Appendix G – Geotechnical Engineering
Exhibit G-1: Boring Logs and Lab Data
Appendix H – Hydrology and Hydraulics Attachment H-1: HEC-RAS Calibration and Validation Plots Attachment H-2: HEC-RAS Velocity Maps Attachment H-3: HEC-ResSim Modeling
Appendix I – Semi-Qualitative Risk Assessment
Public Meeting Display Boards – May 16-18, 2023
ACT River Basin Map
ACT Master Water Control Manual
Document Library
The Nature Conservancy
CONTACT US
AlabamaFishPassage@usace.army.mil