Document Library

 

ACF Signed Water Supply Storage Agreement for Lake Sidney Lanier – January 20, 2021

ACF Cover Letter for Record of Decision – March 30, 2017

ACF Signed Record of Decision – March 30, 2017

ACF Water Control Manual Approval Letter – March 30, 2017

ACF Final Environmental Impact Statement - Vol. 1

ACF Final Environmental Impact Statement (Water Control Manuals) - Vol. 2
    •  Master Manual (Approved March 30, 2017)
    •  Appendix A - Jim Woodruff Lock and Dam and Lake Seminole (Approved March 30, 2017) 
    •  Appendix B - Buford Dam and Lake Sidney Lanier (Approved March 30, 2017)
    •  Appendix C - Walter F. George Lock and Dam and Lake (Approved March 30, 2017)
    •  Appendix D - George W. Andrews Lock and Dam and Lake George W. Andrews (Approved March 30, 2017)
    •  Appendix E - West Point Dam and Lake (Approved March 30, 2017)

ACF Final Environmental Impact Statement - Vol. 3
         • Appendix B, Water Supply Storage Assessment 

ACF Final Environmental Impact Statement - Vol. 4, Part 1
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2a
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2b
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2c
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2d
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2e
         • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 4, Part 2f
          • Appendix C, Pertinent Correspondence

ACF Final Environmental Impact Statement - Vol. 5
         • Appendix D-I 

ACF Final Environmental Impact Statement - Vol. 6
         • Appendix J, USFWS

ACF Final Environmental Impact Statement - Vol. 7
         • Appendix K-O 

ACF HEC-ResSim Model Supporting Documentation (by email request)

ACF HEC-5Q Water Quality Model Supporting Documentation (by email request)

Federal District Court Decision

United States Court of Appeals for the Eleventh Circuit Decision PDF (364K, 95 pp)
Tri-State Water Rights Litigation, July 21, 2010 PDF (95K, 26 pp)
Tri-State Water Rights Litigation, July 17, 2009 PDF (260K, 97 pp)

Federal Notices

Federal Notice of Open House, October 2, 2015 PDF(196K, 2pp)
Federal Notice of Intent, September 23, 2015 PDF
Federal Notice of Intent, October 12, 2012 PDF (165K, 6 pp)
Federal Notice of Intent, November 19, 2009 PDF (849K, 3 pp)
Federal Notice of Intent Supplement, September 19, 2008 PDF (59K, 2 pp)
Federal Notice of Intent, February 22, 2008 PDF (60K, 2 pp)
Federal Notice of Intent November 9, 2007 PDF (57K, 2 pp)

USACE Documents

2012 Corps' Legal Opinion PDF (440.3K, 48 pp)
2012 Corps' Technical Analysis PDF (6.36 MB, 75 pp)
2012 Corps' Hydropower Study PDF (1.44 MB, 72 pp)
May 2012 Finding of No Significant Impact and Environmental Assessment, Revised Interim Operations Plan for Threatened and Endangered Species PDF (6.67 MB, 50 pp)

May 2012 Biological Opinion PDF (3.29 MB, 177 pp)

USACE South Atlantic DR PDS-O-1 (May 31, 2010), PDF

USACE South Atlantic DR 1130-2-16 (March 30, 2001), PDF

Mobile District Draft SOP 1130-2-9 (February 2005), PDF

Other Documents

Georgia's 2000 Request PDF (152K, 2 pp)

2010 Critical Yield Analyses

February 2010 Federal Storage Reservoir Critical Yield Analyses, ACT & ACF Rivers PDF (7MB, 138 pp)
Appendix A: Critical Yield Methodology PDF (173K, 8 pp)
Appendix B: ACT Basin PDF (3.3MB, 41 pp)
Appendix C: ACF Basin Detailed Analysis PDF (3MB, 61 pp)
Appendix D: Prior Reports and References PDF (21K, 3 pp)
Appendix E: Drought Description PDF (8.5K, 2 pp)

2012 Scoping Report

2012 Scoping Report PDF (3MB, 155 pp)
Appendix A: Federal Register Notice PDF (174K, 8 pp)
Appendix B: Press Release PDF (101K, 5 pp)
Appendix C: Newsletter PDF (4.5MB, 5 pp)
Appendix D: Tribal Consultation Notice PDF (1.8MB, 90 pp)
Appendix E: Agency Scoping Meeting PDF (1.7MB, 55 pp)
Appendix F: Technical Modeling Workshop Announcement & Agenda PDF (108K, 5 pp)
Appendix G: Public Scoping Meeting Displays PDF (50MB, 31 pp)
Appendix H: Public Scoping Meeting Handouts PDF (3.9MB, 19 pp)
Appendix I: Oral Comment Roster PDF (33K, 6 pp)
Appendix J: 2008 Original Scoping Comments PDF (50MB, 676 pp)
Appendix K: 2008 Scoping Comments by Issue Area PDF (1.6MB, 464 pp)
Appendix L: 2008 Petitions PDF (30MB, 366 pp)
Appendix M: 2009 Original Scoping Comments PDF (28MB, 534 pp)
Appendix N: 2009 Scoping Comments by Issue Area PDF (397MB,91pp)                                                                                                                      

Appendix O: 2012 Original Scoping Comments1 of 8 PDF (13MB, 100 pp)
Appendix O: 2012 OrIginal Scoping Comments 2 of 8 PDF (12.4MB, 100 pp)
Appendix O: 2012 Orginal Scoping Comments 3 of 8 PDF (16MB, 100 pp)
Appendix O: 2012 Orginal Scoping Comments 4 of 8 PDF (17MB, 80 pp)
Appendix O: 2012 Orginal Scoping Comments 5 of 8 PDF (11MB, 100 pp)
Appendix O: 2012 Orginal Scoping Comments 6 of 8 PDF (13MB, 100pp)
Appendix O: 2012 Orginal Scoping Comments 7 of 8 PDF (10MB, 100 pp)
Appendix O: 2012 Orginal Scoping Comments 8 of 8 PDF (14MB, 63 pp)
Appendix P: 2012 Scoping Comments by Issue Area PDF (1KB, 797 pp)

2010 Scoping Report

2010 Scoping Report PDF (1.5MB, 112 pp)
Appendix A: Federal Register Notice PDF (174K, 8 pp)
Appendix B: Press Release PDF (101K, 5 pp)
Appendix C: Newsletter PDF (4.5MB, 5 pp)
Appendix D: Tribal Consultation Notice PDF (1.8MB, 90 pp)
Appendix E: Agency Scoping Meeting PDF (1.7MB, 55 pp)
Appendix F: HEC-ResSim Technical Modeling Workshop Announcement & Agenda PDF (108K, 5 pp)
Appendix G: Public Scoping Meeting Displays PDF (50MB, 31 pp)
Appendix H: Public Scoping Meeting Handouts PDF (3.9MB, 19 pp)
Appendix I: Oral Comment Roster PDF (33K, 6 pp)
Appendix J: 2008 Original Scoping Comments PDF (50MB, 676 pp)
Appendix K: 2008 Scoping Comments by Issue Area PDF (1.6MB, 464 pp)
Appendix L: 2008 Petitions PDF (30MB, 366 pp)
Appendix M: 2009 Original Scoping Comments PDF (28MB, 534 pp)
Appendix N: 2009 Scoping Comments by Issue Area PDF (397MB, 91 pp)

2008 Scoping Report

2008 Scoping Report PDF (4.3MB, 104 pp)
Appendix A-Federal Register Notice PDF (111K, 5 pp)
Appendix B-Press Release PDF (64K, 3 pp)
Appendix C-Newsletter PDF (3.7MB, 3 pp)
Appendix D-Tribal Consultation Notice PDF (1.8MB, 90 pp)
Appendix E-Agency Scoping Meeting PDF (1.7MB, 55 pp)
Appendix F-HEC-ResSim Technical Modeling Workshop Announcement and Agenda PDF (108K, 5 pp)
Appendix G-Public Scoping Meeting Displays PDF (50MB, 31 pp)
Appendix H-Public Scoping Meeting Handouts PDF (3.9MB, 19 pp)
Appendix I-Oral Comment Roster PDF (33K, 6 pp)
Appendix J-Original Scoping Comments PDF (50MB, 676 pp)
Appendix K-Scoping Comments by Issue Area PDF (1.6MB, 464 pp)
Appendix L-Petitions PDF (30MB, 366 pp)
ACF Display Boards PDF (4.1MB, 27 pp)

Newsletters

December 2016 Release of Final EIS

September 2015 Release of Draft EIS PDF

April 2013: Updated Scoping Report Release
December 2012: Scoping Period Extended PDF
October 2012: Scoping Reopened PDF (3.2MB, 2 pp)
March 2010: Revised Scoping Report Released PDF (491K, 2 pp)
July 2009: Update on Preparation of EIS PDF (443K, 2 pp)
January 2009: Results of the Scoping Process PDF (708K, 2 pp)
October 2008: Announcement of Public Scoping Meetings PDF (3.7MB, 2 pp)

 
 

Workshop Summaries

Summary of a Workshop on Water Issues in the Apalachicola-Chattahoochee-Flint and Alabama-Coosa-Tallapoosa (ACF-ACT) River Basins

Useful Links

Mobile District Corps of Engineers Web Site
Mobile District Corps of Engineers Water Management Web Site

Bibliography of Data Sources

Bibliography of Data Sources

Menu

Redirecting...

Contact Us

Public Affairs Office

USACE, Mobile District
P.O. Box 2288
Mobile, AL 36628-001

(251) 690-2505