The Demopolis Lock chamber was restored to upper pool elevation after successful miter of the lower miter gate, Jan,19, 2024, in Alabama. The U.S. Army Corps of Engineers is working to analyze the extent of the damage and make necessary repairs. (U.S. Army photo by Ryan Reich)
The Demopolis Lock chamber was restored to upper pool elevation after successful miter of the lower miter gate, Jan,19, 2024, in Alabama. The U.S. Army Corps of Engineers is working to analyze the extent of the damage and make necessary repairs. (U.S. Army photo by Ryan Reich)