U.S. Army Corps of Engineers contractor Installs
U.S. Army Corps of Engineers contractor Installs cables that run from the generator to the transformer. The generator was installed at the Barceloneta Water Treatment Plant which provides water to a large number of factories in the area. With power restored, factory workers will be able to return to work

Download Image: Full Size (0.21 MB)
Tags:
Photo by: Mike A. Glasch |  VIRIN: 171101-A-AQ963-002.JPG