A bulldozer places dirt for the new levee in preparation for compacting. Total cost for the design and construction of the relocated levee is an estimated $1.7 million, which includes the locally-funded, non-federal share of 35 percent.
A bulldozer driver places dirt for the levee in preparation for compacting. Total cost for the design and construction of the relocated levee is an estimated $1.7 million, which includes the locally funded, non-federal share of 35 percent.

Download Image: Full Size (2.45 MB)
Tags:
Photo by: John Barker |  VIRIN: 170614-A-WQ258-045.JPG