The vehicle bay inside the new fire station currently being constructed by the U.S. Army Corps, Mobile District, March 12, 2025, at Duke Field, Florida. The old facility can house one fire engine, and the new station will have the capacity to hold up to 10 vehicles. (U.S. Army photo by Chuck Walker)
The vehicle bay inside the new fire station currently being constructed by the U.S. Army Corps, Mobile District, March 12, 2025, at Duke Field, Florida. The old facility can house one fire engine, and the new station will have the capacity to hold up to 10 vehicles. (U.S. Army photo by Chuck Walker)