The front side of the new flight line fire station is being built by the U.S. Army Corps of Engineers, Mobile District, March 12, 2025, at Duke Field, Florida. The new fire station will replace the old facility built in 1950 and provide them with 10 vehicle stalls to park all of their vehicles indoors. (U.S. Army photo by Chuck Walker)
The front side of the new flight line fire station is being built by the U.S. Army Corps of Engineers, Mobile District, March 12, 2025, at Duke Field, Florida. The new fire station will replace the old facility built in 1950 and provide them with 10 vehicle stalls to park all of their vehicles indoors. (U.S. Army photo by Chuck Walker)

Download Image: Full Size (6.1 MB)
Tags:
Photo by: Chuck Walker |  VIRIN: 250312-A-VP913-1001.JPG