The U.S. Army Corps of Engineers, Mobile District closed the Holt Lock and Dam on June 22, a photo of the lock and dam as it awaits to be repaired in Cottondale, Alabama, July 2, 2024. After cracks and leaks were discovered within the lock infrastructure, the lock was closed and the lock is expected to be closed for traffic for three-to-five months as the bulkhead is repaired. (U.S. Army photo by Chuck Walker)
The U.S. Army Corps of Engineers, Mobile District closed the Holt Lock and Dam on June 22, a photo of the lock and dam as it awaits to be repaired in Cottondale, Alabama, July 2, 2024. After cracks and leaks were discovered within the lock infrastructure, the lock was closed and the lock is expected to be closed for traffic for three-to-five months as the bulkhead is repaired. (U.S. Army photo by Chuck Walker)