A view of the repaired Demopolis Lock with a de-watered chamber at the reopening of the Demopolis Lock in Demopolis, Alabama, May 21, 2024. A large concrete portion of the lock broke off on January 16, and exactly four months later the Mobile District and USACE along with its partners was able to repair and reopen the lock. (U.S. Army photo by Chuck Walker)
A view of the repaired Demopolis Lock with a de-watered chamber at the reopening of the Demopolis Lock in Demopolis, Alabama, May 21, 2024. A large concrete portion of the lock broke off on January 16, and exactly four months later the Mobile District and USACE along with its partners was able to repair and reopen the lock. (U.S. Army photo by Chuck Walker)

Download Image: Full Size (4.98 MB)
Tags:
Photo by: Chuck Walker |  VIRIN: 240521-A-VP913-1003.JPG