Three Parker Towing barges are placed in the chamber to assist with gate closure by reducing water turbulence, Jan. 19, 2024 at the Demopolis Lock in Alabama. The U.S. Army Corps of Engineers is working to analyze the extent of the damage and make necessary repairs. (U.S. Army photo by Ryan Reich)
Three Parker Towing barges are placed in the chamber to assist with gate closure by reducing water turbulence, Jan. 19, 2024 at the Demopolis Lock in Alabama. The U.S. Army Corps of Engineers is working to analyze the extent of the damage and make necessary repairs. (U.S. Army photo by Ryan Reich)