Two contractors cut a geogrid fabric which will help stabilize the Northport levee. Approximately 3,000 cubic yards of debris and polluted soil has been removed and disposed of, while relocating and importing close to 10,000 cubic yards of compacted suitable soils.
Two contractors cut a geogrid fabric which will help stabilize the Northport levee. Approximately 3,000 cubic yards of debris and soil has been removed and disposed of, while relocating and importing close to 10,000 cubic yards of compacted suitable soils.

Download Image: Full Size (2.94 MB)
Tags:
Photo by: John Barker |  VIRIN: 170614-A-WQ258-046.JPG